You've Got a Guy, Inc - handyman/home improvement service 773-391-8062(licensed/insured)
Before and After
In order to preserve realism, these pictures were taken with disposable cameras and picture phones.
 
 : This classic home needed a lot of restoration. The walls were cracked ...
This classic home needed a lot of restoration. The walls were cracked ...
 : and the ceiling was a patchwork of stress fractures and cracks.
and the ceiling was a patchwork of stress fractures and cracks.
 : Our professional crew worked hard to pay attention to every detail. Over several days the house was transformed.
Our professional crew worked hard to pay attention to every detail. Over several days the house was transformed.
 : As you can see ...
As you can see ...
 : the results were spectacular.
the results were spectacular.
 : This customer was sick of 1970 shag carpet, cracked and rotted plaster, and wall to wall paneling.
This customer was sick of 1970 shag carpet, cracked and rotted plaster, and wall to wall paneling.
 : We tore out all of the old plaster and panelling and put drywall up.
We tore out all of the old plaster and panelling and put drywall up.
 : We kept the lathe as a base for the new drywall.
We kept the lathe as a base for the new drywall.
 : The result was another happy customer
The result was another happy customer
 : This floor was refinished. Although the color looks different, this is the same room in a different light.
This floor was refinished. Although the color looks different, this is the same room in a different light.
 
 : This customer wanted a new bathroom at a fair price for a rental property in Chinatown, but didn't want to wait too long to rent it.
This customer wanted a new bathroom at a fair price for a rental property in Chinatown, but didn't want to wait too long to rent it.
 : There was extensive water damage from a leaking toilet, rotten drywall, rusted plumbing, and rusted fixtures.
There was extensive water damage from a leaking toilet, rotten drywall, rusted plumbing, and rusted fixtures.
 : We were able to gut this bathroom to the studs and rebuild it in just eight days.
We were able to gut this bathroom to the studs and rebuild it in just eight days.
 : We replaced all fixtures and installed a tile floor.
We replaced all fixtures and installed a tile floor.
 : We used a liicensed plumber to fix the plumbing.
We used a liicensed plumber to fix the plumbing.
 : We installed new green board and a new tub surround.
We installed new green board and a new tub surround.
 : We also put in a new drop ceiling. The entire project cost 5k including material!
We also put in a new drop ceiling. The entire project cost 5k including material!
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Website provided by  Vistaprint
Website
provided by Vistaprint